Installation Guide
Congratulations on purchasing a Rapta AI Station. This guide will walk you through setup and installation of the system in your facility. After following the system installation, please refer to Correct Lighting Setup and Camera Setup to complete the process. The Rapta AI station bench mount stand is designed to be flexible to suit your application environment with custom width and heights available. Our stand can accomodate between one and ten high resolution camera’s with a range of different lens to match your specific application needs. Refer to our guide Camera Setup for details relating to camera and lens selection. We have customers electing to use their existing frame or fixtures, in many cases this is perfectly fine. Contact our Support Team to find out if this is compatible with the Rapta AI Inspection system.
We have several reference designs available to help you get started fast ranging from bench top work cells to cart inspection cells.

Typical installation time
This production stand can be installed in 1 – 2hrs with one to two experienced technicians.
Required tools
The following tools are required to install the production stand:
- 2.5mm Allen Key (ball end preferable)
- 3mm Allen key (ball end preferable)
- 4mm Allen key (ball end preferable)
- 6mm Allen key (ball end preferable)
- Small flat head screwdriver
- #2 Philips driver
- Needle nose pliers
- Spirit level
Assembly process
The Production Stand ships flat pack to your site and requires assembly with the minimum tools listed above. You will need to mount the Rapta stand on a sturdy workbench.
Setting up the Frame
The following details the basic parts required for mounting the cameras and light assembly. RoboUnits is the suggested vendor, however we have customers using T-Slots, Rexroth, 8020 and many other frame types successfully in production environments.
Next steps
After following the system installation, please refer to Correct Lighting Setup and Camera Setup to complete the setup process.